Skip to content

v1.2.0 Preparation

Project Repository material: roadmap, releases and audits. Not product documentation.

Historical record. This is not the list to follow.

This was the minimum bar for v1.2.0, which shipped long ago: the project is on 2.5.0. It is kept so the criteria behind that release can still be read.

The live list, the one followed before publishing any version, is guide 09.

flowchart LR
A["Validate docs"] --> B["Validate CI"]
B --> C["Confirm versions"]
C --> D["Prepare release"]

Adoption maturity.

  • MCP CI stays green
  • integration test stays green
  • README keeps the MCP path visible
  • social preview asset is configured in GitHub
  • one real demo artifact exists outside the repo text docs
  • confirm changelog entries
  • confirm package versions remain aligned
  • confirm examples still match the documented workflow
  • confirm client setup recipes are still accurate
  • confirm release notes mention SDD + MCP together, not separately